题目内容
(请给出正确答案)
提问人:网友lixin080108
发布时间:2022-01-07
[主观题]
When the precast pile is hit by hammer, the correct method for selecting the pile hammer is ().
A.light hammer and low fight
B.heavy hammer and high fight
C.heavy hammer and low fight
D.light hammer and high fight
简答题官方参考答案
(由简答题聘请的专业题库老师提供的解答)
查看官方参考答案