We wish to point out that stipulations in the relative L/C must strictly conform to the stated in ou
A.A.amend
B.B.amendment
C.C.amending
D.D.to amend
- · 有3位网友选择 D,占比33.33%
- · 有2位网友选择 C,占比22.22%
- · 有2位网友选择 B,占比22.22%
- · 有2位网友选择 A,占比22.22%
A.A.amend
B.B.amendment
C.C.amending
D.D.to amend
A.A.
B.B.compliance with
C.C.complaints to
D.D.compliance of
E.E.complaints of
A.confirm B.conform C.inform D.perform
A.even B.even if C.as if D.if
A.as if
B.even if
C.if
D.even
A、condition/late
B、provisions/consequent
C、clauses/later
D、stipulations/subsequent
A: I made a very close study of the draft contract last night.
B: Any questions?
A: Yes.There are a few points which I'd like to bring up.First, the packing.It's stipulated in the contract that all the machine parts should be packed in wooden cases.This can be done with the machine parts, but it's impossible to pack a truck base like that.
B: I see.
A: Second, about the terms of payment.Your draft contract says that payment is to be made by D/P.This is not our practice.We prefer to have the payment made by L/C through a negotiating bank in France.
B: And…
A: And the third point is about arbitration.It's stipulated that arbitration shall take place in China.In all our past contracts signed with you, it was stipulated that arbitration took place in a third country.
B: Yes, that's right.
A: But how is it that this time you wish to have it carried out in China?
B: Shall we take up the matter point by point?
A: That's a good idea.
B: Now, the first point is about packing.We agree to a different packing for the truck.
A: This can easily be done.
B: Second, about terms of payment by L/C.
A: Thank you.
B: As for arbitration, in our dealings with many countries, arbitration is to be carried out in China.The Arbitration Commission of CCPIT enjoys a high prestige among friendly companies.Personally I hope you'll accept this clause.Furthermore, the disputes that have arisen from our business transaction were all settled through friendly consultations.Very rarely was arbitration restored to.
A: I see.OK.The new arbitration clause is acceptable.Is there anything else?
B: As far as the contract stipulations are concerned, there is nothing more.Thank you very much.
A: When should we sign the contract?
B: We'I1 revise the contract this evening, and have it ready to be signed tomorrow morning at ten.How's that?
A: Perfect.
Dear Sirs,
Your shipment of twelve thousand 'Smart' watches was received by our company this morning. However, we wish to make a number of complaints concerning the serious delay in delivery and your failure to carry out our specific instructions with regard to this order.
It was stressed from the beginning that the delivery date had to be less than six weeks from the initial order in order to meet our own customers' requirements. While we understand that delays in production are occasionally inevitable, we must point out that the major reason why the order was placed with your company was because we were assured by you of its speed of delivery, and that your existing stocks were sufficiently high to ensure immediate shipment. Late delivery of the goods has caused US to disappoint several of our most valued customers, and is bound to have a negative effect on potential future orders.
The second complaint concerns the difference in color between the watches we ordered and those delivered. It was stated clearly in the original order that watches in combinations of green/purple and orange/purple only were required. However, only half the watches in the delivery received are of the colors specified. Our Hong Kong agent assures US that she stressed to you the importance of following our instructions precisely, since we consider there to be only a limited market in this country for watches of other colors at the present time. Any watches that are not of the specified colors will, of course, be returned to you.
We are also somewhat concerned about the rather poor quality of the goods received, since it is apparent that the watches that finally arrived have been produced from inferior materials and have been manufactured to a lower standard than those in the sample. We have also found that a number of the watches do not appear to be functioning. Whether the latter problem is due to poor manufacture, damage during transportation or bad batteries is not yet clear, but we should like to point out that we feel this matter to be entirely your responsibility.
As a result of the above problems, therefore, we feel that the most suitable course of action is to return to you unpaid any of the goods considered unsatisfactory, and to subtract any resultant costs from our final settlement. We shall also, of course, be forced to reconsider whether any further orders should be placed with your company.
We look forward to your prompt reply.
Yours sincerely,
John Smith
The manufacturers of "Smart" watches were given the order because ______.
A.they produced the best watches of its kind in the world
B.the watches would be easy to make and the designs were already prepared
C.they promised they could produce enough stocks quite quickly
D.they claimed the order would be easy since the watches were already in stock
The writer's attitude toward nuclear energy is ______.
A.indifferent
B.tolerant
C.favorable
D.negative
为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!