题目内容
(请给出正确答案)
提问人:网友wangkf1973
发布时间:2022-01-07
[主观题]
The total amount of risk that is calculated for a project is found by:A.Multiplying the su
The total amount of risk that is calculated for a project is found by:
A.Multiplying the sum of each the risks times the amount at stake
B.Calculating the cumulative sum of the probability for each risk and multiplying this value times the consequence of occurrence of the risk events
C.Cannot be calculated since all risks are not known
D.The amount of project reserves available
简答题官方参考答案
(由简答题聘请的专业题库老师提供的解答)
查看官方参考答案