在下列关于Project Controlling模式的表述中,错误的是()。A.Project Controlling模式是工程咨询与

在下列关于Project Controlling模式的表述中,错误的是()。

A.Project Controlling模式是工程咨询与信息技术相结合的产物

B.Project Controlling模式反映了建设项目管理专业分工细化的新趋势

C.Project Controlling方是建设工程业主的决策支持机构

D.Project Controlling模式的核心是工程信息流与物质流的结合

简答题官方参考答案 (由简答题聘请的专业题库老师提供的解答)
查看官方参考答案
更多“在下列关于Project Controlling模式的表述中,错误的是()。A.Project Controlling模式是工程咨询与”相关的问题
第1题
The key purpose of project control is to:A.Plan ahead for uncertainties.B.Generate status

The key purpose of project control is to:

A.Plan ahead for uncertainties.

B.Generate status reports.

C.Keep the project on track.

D.Develop the project road map.

E.All of the above.

点击查看答案
第2题
Scope management is:A.a project control function.B.employs change control.C.a work authori

Scope management is:

A.a project control function.

B.employs change control.

C.a work authorization process.

D.considers Cost, Quality and Schedule.

E.All of the above.

点击查看答案
第3题
The contracting function in an organization is considered to be decentralized when ()

The contracting function in an organization is considered to be decentralized when ()

A.Each project manager has control over the contracting process for his or her project

B.The project manager controls contract award

C.The contracting person appointed to the project is available and under the project manager's direct control

D.Contracting is tailored to a single project

E.All above

点击查看答案
第4题
2The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cost

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
第5题
What information does a control chart provide to a project manager?A.Indicates the need fo

What information does a control chart provide to a project manager?

A.Indicates the need for variance analysis.

B.Illustrates how a process behanves over tim

C.Helps a project manager to change the project scop

D.Identifies the project risks.

点击查看答案
第6题
Quality control is normally performed by the _____ .A.QA personnelB.project teamC.operatin

Quality control is normally performed by the _____ .

A . QA personnel

B . project team

C . operating personnel

D . project management

E . None of the above.

点击查看答案
第7题
The Perform. Integrated Change Control process is conducted from project lnception throug
h completion and is the ultimate responsibility of the(75)

A.change control board

B. project management office

C.project manager

D.configuration management officer

点击查看答案
第8题
You just been assigned as project manager for a project that is in the middle of the execu
tion phase, and you are determining how you will control the project . The BEST way to control the project is to :

A.use a combination of communication methods .

B.hold status meetings because they have worked best for you in the past .

C.refer to the Gantt chart weekly .

D.meet with management regularly .

点击查看答案
第9题
129Quality control is normally performed by the _____ . A.QA personnel B.project team C.op

129 Quality control is normally performed by the _____ .

A. QA personnel

B. project team

C. operating personnel

D. project management

E. None of the above

点击查看答案
第10题
101It is argumentative whether project managers actually control costs. Which of the follo

101 It is argumentative whether project managers actually control costs. Which of the following is the most common element over which the project manager may have some degree of control?

A. Direct labor dollars

B. Direct labor hours.

C. Overhead rates.

D. Procurement costs.

E. None of the above

点击查看答案
第11题
42Which of the following organizations has the best technical project control? A.matrix B.

42 Which of the following organizations has the best technical project control?

A. matrix

B. functional

C. projectized

D. B and C

E. A and B

点击查看答案
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注简答题 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注简答题 -
请用微信扫码测试
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

简答题
下载APP
关注公众号
TOP