设备安装工程具备单机无负荷试车条件,由()组织试车。A.发包人B.监理工程师C.承包人D.咨询工程师
设备安装工程具备单机无负荷试车条件,由()组织试车。
A.发包人
B.监理工程师
C.承包人
D.咨询工程师
设备安装工程具备单机无负荷试车条件,由()组织试车。
A.发包人
B.监理工程师
C.承包人
D.咨询工程师
A. 防爆电器设备在试车前,应制订操作规程及安全措施
B. 在进行单体试车、联动或生产试车时,应按规定作出详细记录
C. 试车人员应由领导统一指挥
A.项目经理在大部分决策前应请示上级决策者
B.项目经理是整个团队的负责人,要独立地领导团队完成项目任务
C.项目经理应当是技术权威
D.项目经理的管理主要限于项目内部,不必具备社交能力
E.项目经理应当具备相应的综合能力与写作能力
A.属于附延缓条件的民事法律行为
B.属于附解除条件的民事法律行为
C.属于附期限的民事法律行为
D.既不是附条件、也不是附期限的约定
Industrial Revolution. (31) they were not enough. Something else was needed to start the industrial process. That "something special" was men-- (32) individuals
who could invent machines, find new sources of power, and establish business organizations to reshape society. The men who (33) the machines of the Industrial Revolution came from many backgrounds and many occupations. Many of them were (34) inventors than scientists. A
man who is a pure scientist is primarily interested in doing his research (35) . He is not necessarily working so that his findings can be used. An inventor or one
interested in applied science is (36) trying to make something that has a concrete idea. He may try to solve a problem by using the theories (37) science or by
experimenting through trial and error. Regardless of his method, he is working to obtain a specific result: the construction of a harvesting machine, the burning of a
light bulb, or one of (38) other objectives. Most of the people who developed the machines of the Industrial Revolution were inventors, not trained scientists. A few were both scientists and inventors. Even
those who had (39) or no training in science might not have made their inventions if a groundwork had not been laid by scientists years (40) .A.ButB.AndC.Besides D.Even
A.可行性研究
B.项目评估及决策
C.施工图设计
D.实现投资决策意图
E.试生产
A.检查供货人主要原材料以及外协配件的采购和准备进展情况
B.检查供货人各关键工序是否按生产计划进行
C.评估供货人的进度状态,确保全部关键控制点的进度按期进行
D.检查设备和材料的制造、组装、试验、检验和装运的准备情况
E.从投料开始对货物制造过程进行质量检查,保证货物质量
A.一部分教师以本职工作为副,以第二职业为主,使得教育工作受到了不良的影响。
B.一部分教师因待遇低而跳槽改行,使得教育工作受到了不良的影响。
C.一部分教师跳槽改行,“下海”经商;另一部分教师人在课堂,心在市场。
D.教师不能全身心地投入教育事业。
A.确保业主获知工程项目进展状况,满足业主检查工程项目进展情况的需求
B.进一步确认项目组织对工程项目承诺的实现程度
C.可作为项目建设终结绩效的依据
D.尽早发现项目实施的问题,以便提前采取措施
E.作为考核工作成果、实行奖惩的依据