压气站布置的基本步骤The basic steps of compressor ...
压气站布置的基本步骤The basic steps of compressor station layout 根据上面讨论,归纳出压气站布置的基本步骤如下According to the above discussion, the basic steps of compressor station layout are summarized as follows: (1)根据末段储气要求确定末端参数:P1max、P2min、和lZ;The terminal parameters were determined according to the requirements of the terminal gas storage: P1max, P2min, and lZ (2)根据任务流量和式(10-8)、(10-9)或(10-6)初步确定压气站数,并化整(向上);According to equation (10-8), (10-9) or (10-6) of task flow sum, the number of compressor stations is preliminarily determined and integrated (up). (3)由于站数化整,需根据式(10-10)至(10-16)复核最大工作压力Pmax下的最大流量Qmax(或QZmax),或者根据任务流量Q核算该流量下的最高工作压力PmaxDue to the integration of stations, the maximum flow Qmax (or QZmax) under the maximum working pressure Pmax should be checked according to formula (10-10) to (10-16), or the maximum working pressure Pmax under the maximum working pressure should be calculated according to the task flow Q (4)根据式(10-3)或(10-5)计算各站间的站间距,并布置压气站According to formula (10-3) or (10-5), calculate the station spacing between each station and arrange the compressor station; (5)计算各站其余的工艺参数:如进站压力PZi、压力比ε、压头H、功率N和出站温度T2等等。The remaining process parameters of each station are calculated, such as inlet pressure PZi, pressure ratio, head H, power N and outbound temperature T2, etc. (6)根据计算成果和实际需要对某些站进行调整,并重新核算。According to the calculation results and actual needs for some stations to adjust, and re - accounting.