An activity variance arises solely due to the difference in the level of activity included in the planning budget and the actual level of activity.

简答题官方参考答案 (由简答题聘请的专业题库老师提供的解答)
查看官方参考答案
更多“An activity variance arises solely due to the difference in the level of activity included in the pl…”相关的问题
第1题
In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()

A. budget

B. plan

C. risk

D. contract

点击查看答案
第2题
Economic Growth

The economy of a nation requires (46) . Total output must grow if the country is to absorb about 1.5 million new workers who enter the labor force each year and more workers who are replaced each year as a form. of technological change. If the nation produced the same level of output each year, instead of increasing it, people would have fewer jobs, growing unemployment, and a decline in the per-capita(人均的)income of the nation. To maintain or increase the existing standard of living and to prevent unemployment from rising, (47) . Higher rates of employment and substantial per-capita output gains seem to occur when the real economic growth rate is over 3%, as it was in the years 1983 through 1988. Recent experience shows that, with a real growth rate of less than 2.5%, the U.S. economy suffers from (48) .

For example , unemployment at the end of 1990 was 5.4% of the labor force. But by the end of 1991, unemployment was more than 6.6% of the labor force. Why did this happen? Simply because the real output of goods and services declined in 1991. New members into the labor force could not be absorbed, so (49) . Furthermore, a large number of workers withdrew from the labor force altogether because (50) . Instead of rising in 1991 , the real GDP actually fell 0.7%. Real GDP rose again in 1992 by 2.6%, but unemployment also rose to 7.3% of the labor force. GDP continued to rise during 1993, gained a 3%. At the same time unemployment stood at 6.8% of the labor force. Per-capita in-come also grew again during 1993.

A.unemployment rose

B.they were unable to find work

C.a healthy rate of economic growth

D.out of work

E.they must increase real gross domestic product (GDP) continuously

F.higher unemployment and limited gains in per-capita output and income

(46)

点击查看答案
第3题
An activity variance is the difference between what the total revenue should have been, given the actual level of activity for the period, and the actual total revenue.
点击查看答案
第4题
flexible budget allows us to isolate activity variances and revenue and spending variances.
点击查看答案
第5题
Which one of the following variances is most controllable by the production control supervisor?

A、Material price variance

B、Material quantity variance

C、Variable overhead spending variance

D、Fixed overhead budget variance

点击查看答案
第6题
The Haney Company has a standard costing system. Variable manufacturing overhead is assigned to production on the basis of direct labour-hours. The following data are available for January: Actual variable manufacturing overhead € 25,500 Actual direct labour-hours worked 5,800 Variable overhead spending variance € 600 favourable Variable overhead efficiency variance € 2,475 unfavourable What were the standard hours allowed for January production?

A、5,250 hours

B、5,425 hours

C、5,800 hours

D、5,975 hours

点击查看答案
第7题
Which of the following statement is not true?

A、Standards should be designed to encourage efficient future operations, not just a repetition of past inefficient operations.

B、The standard quantity per unit for direct materials should reflect the amount of material required for each unit of finished product, as well as an allowance for unavoidable waste, spoilage, and other normal inefficiencies.

C、The price standard for variable manufacturing overhead comes from the variable portion of the predetermined overhead rate.

D、The standard rate per hour for direct labor includes only wages earned.

点击查看答案
第8题
What is the direct material quantity variance for the period?

A、$5,280 F

B、$5,280 U

C、$6,912 F

D、$6,912 U

点击查看答案
第9题
What is the direct labor efficiency variance?

A、$2,352 F

B、$2,352 U

C、$4,320 F

D、$4,320 U

点击查看答案
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注简答题 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注简答题 -
请用微信扫码测试
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

简答题
下载APP
关注公众号
TOP