A、Kommst, mit, keine
B、Kommst, mit, nicht
C、kommen, ab, keine
D、kommen, ab, nicht
A community theater received a request from the local opera company to stage a production at the theater the following January. The theater director agreed to have a local designer design the sets for the opera. They signed a written contract that promised the designer $5,000 for the sets. The director had some specific ideas and insisted on some detailed specifications for the sets. However, the theater stage was smaller than was really needed, and it would be difficulty to fit everything the director wanted into the production. Under the agreement, the designer was to provide all material and labor and would begin work on October 1. The $5,000 would be paid upon completion of the sets. The designer was going to make a profit of $1,000. On September 15, the director called the designer and told her that it was impossible for the theater to stage the opera and that she was going to cancel the production. Knowing that her contract was enforceable, the designer urged the director not to act hastily and to take some time to think about it. On September 17, the designer spent $1.500 on materials for the sets that she was to build according to the director’s specifications. The materials were not suitable for anything other than the opera sets. If the designer sues the theater for breach for contract, what is she entitled to recover?
A、(A) Nothing, because she is estopped from recovering damages due to her failure to mitigate.
B、(B) $1,000 as expectation damages.
C、(C) $1,000 as expectation damages and $1,500 as reliance damages.
D、(D) $5,000 as expectation damages.
为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!