搜题
网友您好,请在下方输入框内输入要搜索的题目:
搜题
题目内容 (请给出正确答案)
提问人:网友wu13yan 发布时间:2022-01-06
[主观题]

Project (24) Management includes the processes required to ensure that the project include

Project (24) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

A.Integration

B.Scope

C.Configuration

D.Requirement

简答题官方参考答案 (由简答题聘请的专业题库老师提供的解答)
查看官方参考答案
更多“Project (24) Management includes the processes required to ensure that the project include”相关的问题
第1题
Project (24) Management includes the processes required to ensure that the project include

Project (24) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

A.Integration

B.Scope

C.Configuration

D.Requirement

点击查看答案
第2题
The most important factors for the travel agents to succeed are ______.A、good managem

A.good management and good service

B.good offices

C.computer reservations systems

D.fare quotations and ticketing skills

点击查看答案
第3题
Martin Chambers believes that his company is successful becauseA.he has built up a managem

Martin Chambers believes that his company is successful because

A.he has built up a management team he can rely on.

B.it introduces change before it becomes necessary to do so.

C.he is experienced at responding to changes in the market.

D.it has more innovative products than competitors.

点击查看答案
第4题
听力原文:If there had been more cooperation between the two sides, the project would have
been finished according to the schedule.

(24)

A.We are content with our cooperation.

B.We plan to strengthen our cooperation.

C.The project was not approved by the two sides.

D.The project was not completed on time.

点击查看答案
第5题
24Ensuring that all work is both authorized and funded by contractual documentation is the

24 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:

A. The project manager

B. The functional manager

C. The project sponsor

D. The client

E. All of the above

点击查看答案
第6题
以下叙述中,错误的是()。 A.DBMS是位于用户与操作系统之间的一层数据管理软件 B.DBMS是DataBase Managem

以下叙述中,错误的是( )。

A.DBMS是位于用户与操作系统之间的一层数据管理软件

B.DBMS是DataBase Management System的缩写

c.数据库系统减少了数据冗余

D.DBMS是指采用了数据库技术的计算机系统

点击查看答案
第7题
24Project managers must know: A.What kind of message to send B.to whom to send the message

24 Project managers must know:

A. What kind of message to send

B. to whom to send the message

C. how to translate the message into a language that everyone can understand

D. All of the above

E. A and B only

点击查看答案
第8题
The Channel Tunnel(海底隧道), to be opened officially by British Queen Elizabeth II and Fr

The Channel Tunnel(海底隧道), to be opened officially by British Queen Elizabeth II and French President Francois Mitterrand on March 8, links(连接) British and France for the first time since the Ice Age. The project spent eight years completing and cost an estimated(估计)$13.5 billion. The channel is considered an engineering wonder of the 20th century. Le Shuttle is the channel's specially built train. The total journey time between Calais, France and Folkstone Britain is 35 minutes. The service is scheduled to run 24 hours a day, seven days a week in both directions.

According to this piece of news, who first suggested digging the Channel Tunnel?

A.British Queen Elizabeth Ⅱ.

B.A French engineer.

C.Someone that hasn't been mentioned in the passage.

D.French President Francois Mitterrand.

点击查看答案
第9题
•Read the article below about the impact of technology on the environment.

•Choose the best word to fill each gap from A, B, C or D on the opposite page.

•For each question 21-30, mark one letter (A, B, C or D) on your Answer Sheet.

Business and the environment

These days in business, people have to face many challenging questions when designing , and implementing new projects in undeveloped areas of the countryside. One issue which has to be faced is whether it is possible to introduce new technology without destroying the local environment.

Economic (21) and environmental conservation are often seen as natural enemies. It is unfortunate that in the past this has often been true, and it has been necessary to choose between (22) the project or protecting the environment. However, by taking environmental considerations (23) at an early stage in a project, companies can significantly reduce any impact on local plants and animals.

For example, in southern Africa, a company called CEL was asked to put up 410 km of a power transmission line without disturbing the rare birds which inhabit that area. The project was carried out with (24) disturbance last summer. What may surprise many business people is the fact that this consideration for local wildlife did not in any way (25) down the project. Indeed, the necessary advance planning (26) with local knowledge and advanced technology, (27) that the project was actually completed ahead of schedule. CEL was contracted to finish the job by October and (28) to do so two months earlier.

CEL is one of those companies which is (29) to the principle of environmental conservation. Many other companies have yet to be (30) of the importance of balancing the needs of people with those of the environment. However, it may be the only realistic way forward.

(21)

A.development

B.progression

C.rise

D.increase

点击查看答案
第10题
听力原文:W: Now Mr. Gates, lets continue our talk about your proposal about the waste recy
cling project.

M: Well, (23) it's a rather simple project at the beginning. It would consist of only one production line, but we could expand it afterwards.

W: How much is the financial investment?

M: Including loans? I would say in the area of two million US dollars.

W: I see.

M: How much would you like to invest in this project?

W: (24) As a general practice we lay out 51 percent of the overall investment. This includes, of course, capital, factory, buildings and equipments, things like that.

M: That seems reasonable. Now let's come to the time frame. How long does the venture run?

W: How long would you want?

M: As it's a small venture, I would suggest 5 years to start with.

W: The contract is renewable and can be extended if both sides agreed.

M: How long do the board members serve?

W: I would say Five years.

M: (25) The chairman would be the legal representative.

W: Yes. A management office would be brought forth and would be responsible for the day to day running of the joint venture. So far as the management is concerned, you might appoint the manager and the chief engineer of the project. And we might appoint their deputies.

M: Ok, sounds good.

(20)

A.The production cost.

B.The financial outlay.

C.The bank loans.

D.The production line.

点击查看答案
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注简答题 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注简答题 -
请用微信扫码测试
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

简答题
下载APP
关注公众号
TOP