搜题
网友您好,请在下方输入框内输入要搜索的题目:
搜题
题目内容 (请给出正确答案)
提问人:网友yudsly 发布时间:2022-01-07
[主观题]

信用证资料: FROM : NATIONAL COMMERCIAL BANK, JEDDAH TO : BANK OF CHINA, JIANGSU BR. DAT

信用证资料:

FROM : NATIONAL COMMERCIAL BANK, JEDDAH

TO : BANK OF CHINA, JIANGSU BR.

DATE : JAN. 03,2007

L/C NO.: 6688

L/C AMOUNT: USD28 820.00

APPLICANT: XYZ COMPANY, JEDDAH

BENEFICIARY: ABC COMPANY, SHANGHAI

DRAFTS TO BE DRAWN ON US AT SIGHT FOR 90PCT OF INVOICE VALUE

PARTIAL SHIPMENTS: NOT ALLOWED

MERCHANDISE: ABT 48000 CANS OF MEILING BRAND CANNED ORANGE JAM, 250

GRAM/CAN, 12 CANS IN A CARTON.

UNIT PRICE: USD6.55/CTN CIF JEDDAH

COUNTRY OF ORIGIN: P. R. CHINA

DOCUMENTS REQUIRED: COMMERCIAL INVOICE IN 3 COPIES DATED THE SAME

DATE AS THAT OF L/C ISSUANCE DATE INDICATING COUNTRY OF ORIGIN OF THE

GOODS AND CERTIFIED TO BE TRUE AND CORRECT, INDICATING CONTRACT NO.

SUM356/05 AND L/C NO.

...

ADDITIONAL CONDITIONS: ALL DOCUMENTS MUST INDICATE SHIPPING MARKS AS

JAM IN DIAMOND JEDDAH.

2.附加信息:

发票号码:ABC123/2007

受益人的有权签字为李平

出仓单显示货物:

52800 CANS OF MEILING BRAND CANNED ORANGE JAM

提单显示货物从上海运往吉达。

船名:IINDA V.123

信用证资料: FROM : NATIONAL COMMERCIAL BANK, JEDDAH TO

简答题官方参考答案 (由简答题聘请的专业题库老师提供的解答)
查看官方参考答案
更多“信用证资料: FROM : NATIONAL COMMERCIAL BANK, JEDDAH TO : BANK OF CHINA, JIANGSU BR. DAT”相关的问题
第1题

LETTER OF CREDIT NO.: YS1234 BENEFICIARY:CHINA MACHINERY IMP & EXP CO.,NINGBO BRANCH AMOUNT:USD 18 400.00 LIST OF DOCUMENTS: …… INSURANCE POLICY IN DUPLICATE BLANK ENDORSED COVERING ALL RISKS AND WAR RISK FOR 110% INVOICE VALUE CLAIM AT LONDON,ENGLAND COVERING:400SETS BUTTERFLY SEWING MACHINES PACKING:IN WOODEN CASES OF 1 SET EACH SHIPMENT:FROM NINGBO TO LONDON,ENGLANDBY VESSEL "HONGZHEN"V.65 ON JULY 15,2017 WITH TRANSSHIPMENT AT HONGKONG INVOICE NO.:MIE201156 SPECIAL CONDITIONS : ALL DOCUMENTS MUST SHOW THE L/C NO. 补充资料: CONTRACT NO.:2017003 POLICY NO.:20170712 B/L NO.:20171235

点击查看答案
第2题
The Glass-Steagall Act made it illegal for an investment bank to buy or sell securities on behalf of its customers.
点击查看答案
第3题
Which one of the statements about the issuing date of the commercial invoice is NOT correct? ( )

A、The date can be earlier than the issuing date of the letter of credit.

B、The date can be later than the expiry date of the credit.

C、The date is earlier than the date of shipment.

D、The date can be same date as the date of shipment.

点击查看答案
第4题

A Shanghai-based trading company exported bicycles to a Danish importer in Copenhagen. Trade term of this transaction is CIF and the payment term is by letter of credit. You are given seven documents of this transaction. They are 1. Sales confirmation 2. Letter of credit 3. Draft 4. Commercial invoice 5. Packing list 6. Bill of lading 7. Insurance policy The contents in the sales confirmation and the letter of credit are complete. The other five documents are unfinished with blank columns, but they also contain information you may need for completing other documents. Please use information in the sales confirmation and the letter of credit, as well as the draft, commercial invoice, packing list, bill of lading and insurance policy to fill the blank columns in the draft, commercial invoice, packing list, bill of lading and insurance policy. The blank columns which you need to fill are numbered and highlighted by blue color, e.g. (1), (2), (3),…. The seven documents can be downloaded from the site as separate files. When writing your answers, you need to write both the number of the column and your answer for each document separately. You get one point for each numbered blank column correctly filled. Total points: 40

点击查看答案
第5题

A Chinese LED lights manufacturer signed a sales contract with a French importer for selling 5,400 pieces of LED light bulbs. The time of shipment of the ordered goods is the end of September of 2017. On September 11, the manufacturer’ production facility and warehouse caught heavy fire and all the buildings and stocks were destroyed by fire. The preliminary investigation on the cause of the fire conducted by the local fire department suggested that the fire was caused by lightning. The Chinese LED lights manufacturer would like to notice the French buyer about the incident and cancel delivery of the LED light bulbs citing the Force Majeure clauses of the sales contract. Questions: Based on this case, please answer the following questions. 1). Is the fire a Force Majeure event? (1’) Why? Please give the answer according to the elements that constitute a Force Majeure event. (3’) 2). Could the Chinese manufacturer terminate the performance of the contract (1’) and why? (2’) If yes, the act of termination of the contract is regulated by which international treaty on international trade? (1’) What should the Chinese manufacturer do in order to properly invoke 援引 the Force Majeure clause and be exempted from performing the contract? (1’+1’) Total 10 points

点击查看答案
第6题

A Chinese trading company (the Buyer) entered a contract with a Japanese manufacturer (the Seller) of precision machinery and testing equipment for purchasing 15 sets of production lines. The total value of the contract is 400,000 US dollars. Price terms: CFR Shanghai; Time of shipment: the end of September 2017; Payment terms: Buyer opens an irrevocable negotiable letter of credit in full amount two months prior to the date of shipment. In the sales contract, the place of arbitration is China. On July 29, 2017, the buyer opened a letter of credit through a bank in favour of the seller and no deposit was made. The seller, on September 8, shipped the production lines, and negotiated the payment to the negotiating bank. On September 19, the 15 sets of production lines arrived at the port of destination – Shanghai. The regional commodity inspection authority inspected the production lines. The inspection report issued by the authority showed that: 4 out of 15 sets of the production lines are not in conformity with the quality terms stipulated in the sales contract. These 4 sets of production lines cannot be used to manufacture standard-conforming products at all. The buyer insisted that the 15 sets of production lines should be used together. Since 4 sets of the production lines were of no use, the remaining 11 sets of qualified production lines should be rejected as well. Therefore, on September 29, 2017, the buyer sent a memo to the Japanese manufacturer, which requested that all 15 sets of production lines should be sent back to Japan. However, the Japanese seller neither signed the memo nor replied to the Chinese buyer’s request. The buyer finally brought the case to the CIETAC, the arbitration institution specified in the sales contract. The demands of the buyer were: 1). Return the 15 sets of the production lines. The seller should fully refund the payment and bear the costs and expenses associated with the return. 2). The buyer signed a contract with another Chinese company for renting out all 15 sets of the production lines. Because the 4 sets of faulty production lines, the buyer had already paid compensation of 15,000 US dollars to the leasing Chinese company. The buyer demanded that the seller should bear the loss and pay the buyer 15,000 US dollars. Questions: 1. Other than the discrepancy and claim clauses, what kind of clause regarding dispute resolution should be included in the sales contract of this case? (1’) Why? (1’) 2. What could be the arbitration awards the arbitration court gives in terms of the demands of the buyer? (1’+1’) Give your answers for the following subjects a. Return of 15 sets of production lines b. economic loss to the Chinese buyer which rented out the equipment 3. Since the Japanese manufacturer did not sign the memo and respond to the Chinese buyer, could the buyer bring the case to a court in China and sue the Japanese seller for damage and loss first before arbitration? Why? (2’+2’) After the arbitration award was made, if the Japanese manufacturer refused to honour the award, what could the Chinese buyer do? (2’) Total 10 points

点击查看答案
第7题
Whether a late acceptance becoming effective depends on ( ).

A、the decision of the offeree

B、the decision of the offeror

C、the decisions of both the offeror and offeree

D、local law and regulations

点击查看答案
第8题
More or less clause allows the seller to deliver goods with tolerance in terms of ( ).

A、quantity

B、packing

C、quality

D、contract price

点击查看答案
第9题
According to the INCOTERMS 2010, the critical point of risk transferring under the CIF term is ( ).

A、On board the vessel at the port of destination

B、Alongside the vessel at the port of destination

C、On board the vessel at the port of shipment

D、Alongside the vessel at the port of shipment

点击查看答案
第10题
Which of the following prices can be quoted for China’s import?

A、USD 15.00 per set CIF Shanghai

B、EUR 15.00 per set FOB Antwerp

C、USD 15.00 per set CIP Dalian, China

D、USD 15.00 per set CIF Antwerp

E、USD 15.00 per set FOB Shanghai

F、USD 15.00 per set CPT Antwerp

点击查看答案
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注简答题 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注简答题 -
请用微信扫码测试
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

简答题
下载APP
关注公众号
TOP