173The Risk of NOT meeting project quality objectives: A.can be minimized through continuo
173 The Risk of NOT meeting project quality objectives:
A. can be minimized through continuous monitoring.
B. considered a long term risk.
C. will be reflected in the "in-service" life of the product or service.
D. B and C
E. All of the above.