Using the WBS shown in the Special window, a typical work package would be:ASoftware devel
Using the WBS shown in the Special window, a typical work package would be:
ASoftware development
BSystems design
CCoding
DA, B, and C
ENone of the above.
Using the WBS shown in the Special window, a typical work package would be:
ASoftware development
BSystems design
CCoding
DA, B, and C
ENone of the above.
A The project manager
B The project office
C The project team
D The project sponsor
E Anyone associated with the project
A 2
B 3
C 4
D 5
E 7
A.为小组创设一个名称
B.规定灵活的工作时间
C.制订项目章程
D.为重要的或特别的事情举行庆祝活动
A.与组织的其它项目小组分享最后的经验
B.警告其它他人可能发生的问题
C.对缓解风险的方法提出建议,以保证项目成功
D.只分享项目积极的经验,以方便组织的其它项目借鉴