70The critical path is calculated by A.subtracting the end date of task one from the start

70 The critical path is calculated by

A. subtracting the end date of task one from the start date of task two.

B. determining which tasks have the least amount of total slack.

C. totaling the time for all activities.

D. determining the shortest path through the network.

E. Determining which tasks have the most slack

简答题官方参考答案 (由简答题聘请的专业题库老师提供的解答)
查看官方参考答案
更多“70The critical path is calculated by A.subtracting the end date of task one from the start”相关的问题
第1题
In a double-entry accounting system, the total amount debited must always equal the total amount credited.
点击查看答案
第2题
The price elasticity of demand is calculated as the absolute value of the
A.percentage change in quantity demanded divided by the percentage change in price

B.percentage change in price divided by the percentage change in quantity demanD

C.change in quantity demanded divided by the change in price

D.change in price divided by the change in quantity deman

D.

点击查看答案
第3题
The main reason for this increase in life expectancy is the improvement in living standards.
点击查看答案
第4题
114 The appointment or selection of a project sponsor is often based upon:

A. The strategic importance of the project

B. Who the customer is

C. Whether the organization is project or non-project-driven

D. The profitability of the project

E. All of the above

点击查看答案
第5题
116 When all members must unanimously agree before a decision is reached

A. all members become committed

B. decisions are reached slowly

C. integrity is developed

D. future decision making ability is enhanced

E. All of the above

点击查看答案
第6题
168 A work breakdown structure:

A. assures all work is identified.

B. subdivides the project into manageable segments.

C. provides the project sponsor with a time-phase task summary.

D. both A and B.

E. All of the above.

点击查看答案
第7题
● Using the WBS shown in the Special window, a typical work package would be:

A Software development

B Systems design

C Coding

D A, B, and C

E None of the above.

点击查看答案
第8题
● The project charter is a document designed to tell _____ exactly what the project entails.

A The project manager

B The project office

C The project team

D The project sponsor

E Anyone associated with the project

点击查看答案
第9题
● Using the figure in the Special window, The slacktime in Activity "G" is _____ weeks.

A 2

B 3

C 4

D 5

E 7

点击查看答案
第10题
●按照系统安全等级中的可靠性等级由高到低分别为(29)。

(29) A.绝密、机密、秘密 B.军用、商用、民用

C.A 级、B 级、C 级 D.使用级、修改级、控制级

点击查看答案
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注简答题 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注简答题 -
请用微信扫码测试
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

简答题
下载APP
关注公众号
TOP